The Incuba Dunstable

Project Value £3.4Million

Project Description

This project involved the design and build of a two storey SME incubator and education teaching facility together with associated car parking, external works and drainage.

Incuba2The Incubator was designed with energy conservation at the forefront of the design and focused on reducing energy demands through passive energy efficiency measures using low and zero carbon technologies. External lighting was designed to ensure consideration was given to neighbouring properties. Acoustic performance was achieved throughout the building in-line with BREEAM Excellent requirements.

Incuba3The visual comfort of occupants was ensured by careful consideration of lighting specifications throughout the building. Materials with a low environmental impact were used throughout.

 

Project Details

  • Client Central Bedfordshire College
  • Date 10th October 2013
  • Tags Education

Related Projects